Project Summary
The low water dam on Comegys Creek in McKinney, TX, part of the Eldorado Country Club, was facing a critical issue – loss of the downstream footing due to erosion under the concrete apron. Compounding the problem was the dam’s original design and construction, which allowed constant flow over the spillway. Further, an additional low water dam downstream was impounding water at the apron’s downstream end.
To address this complex issue, a repair solution was needed to halt erosion, restore the footing, and ensure the dam’s long-term stability and safety. By understanding the root causes of the problem, Cardinal Strategies designed and implemented a targeted repair to protect this important water resource infrastructure.
Under Construction
Post-construction
Cardinal Strategies provides the engineering, environmental, and construction expertise needed to solve complex stormwater challenges.
2024 WBE of the Year Award Winner
Firm PE Certifications:
Texas Firm No. F-11976
Oklahoma Firm No. 7713
© 2023 Cardinal Strategies. All Rights Reserved.
Site built by Harp & Sling